Project
from Sector 9 Arena CAP | Curitiba, PR

F
I
C
H
A

T
É
C
N
I
C
A

Memory

A temporary installation based on the assembly of a 70×30 m tent in plan (2,100 m²), with circulation, sectors and uses organized around the perimeter of the tent. Inside, a stage will be set up to host national events, with dressing room services on the sides and sound and image equipment installations. The façade of the tent, with a height of fourteen meters, will be made up of PVC ducts fixed together and painted yellow. Between the PVC pipes and the structure of the tent, modular scaffolding towers will be installed to fix the pipes and guarantee their stability.

In front of Buenos Aires Street, the main access will be created with a marquee built from a concrete slab with innovative construction technology (Bubble-deck), supported by metal pillars modulated according to the metal structure of the tent. Next to the marquee, masonry ticket offices will be built, giving volumetric continuity to the parking lot exits.

On the sides of the tent, 4 sanitary containers and 4 bar containers will be installed with service on both sides. These containers will be connected to the Arena's sewage, water and energy networks. Outside, there will be areas for food trucks, tables and commercial stands. On the corner of Rua Brasílio Itiberê and Rua Buenos Aires, the CAP stand will be installed, allowing members exclusive access to the complex, which will be characterized as a large metal soccer.

All the structures designed and installed in the Sector 9 space will be lightweight and can be removed quickly.

Even before the facilities were completed, the space was used for an event parallel to the UFC. The Workout took place four days before the main event, bringing together approximately 3,500 people.

Technical sheet

CAP Arena Sector 9 Project | Curitiba, PR